Tuesday, March 13, 2007

March 1, 2007

2007*
DaimlerChrysler Cars

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN WEEKS

KEY PRODUCTION

HOLD OR DELAY

Chrysler 300/300C,

Dodge Magnum,

Dodge Charger

12-14

  • (WPC) 18” aluminum wheels have a Job #1 of 4/2/07 (LXE***)

Chrysler Pacifica

14-16

  • AWD models have a 18-20 week lead time

The following paint colors have a final build date of 3/23/07**:

  • (PYG) Linen Gold
  • (PPK) Magnesium Pearl
  • (PB6) Marine Blue
  • (PVJ) Cognac Crystal Pearl

Chrysler PT Cruiser

14-16

None

Chrysler Sebring Sedan

16-18

  • (XWS) Driver sunglass holder has a Job #1 of 4/2/07

2008 Dodge Avenger

TBD

  • (XWS) Driver sunglass holder has a Job #1 of 4/2/07
  • (JSEX41) Avenger R/T AWD model has a Job #1 of 4/23/07

Dodge Caliber

22-24

  • (CJ1) Front seat side airbags have a Job #1of 3/12/07 (PM**49)

Jeep Compass

16-18

  • Compass 4x4 models have a 24-26 week lead time

  • (CJ1) Front seat-mounted side airbags have a Job #1 of 3/12/07 (MK**49, MK**74)

2007*
DaimlerChrysler Trucks

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN
WEEKS

KEY PRODUCTION

HOLD OR DELAY

Chrysler Town & Country

Dodge Grand
Caravan/Caravan

14-16

None

Dodge Dakota

14-16

  • (DMH) 3.92 axle w/o (DSA) limited slip differential has a Job #1 of 4/5/07

Dodge Durango

10-12

None

Chrysler Aspen

8-10

None

Dodge Nitro

12-14

None

Dodge Ram Pickup DR 1500, 2500, 3500 and Mega Cab

10-16

The following options have a Job #1 of 3/5/07:

  • (LBN + DG3) Power take off
  • (ETH) 5.9L HO Cummins Turbo Diesel engine w/(NBA) Underground Calibration
  • (AR9) Single Rear Wheel Group with (SKS/SKT) heavy duty front springs
  • (ETJ) 6.7L Cummins turbo diesel engine

Jeep Grand Cherokee

14-16

  • (TBB) Full-size spare has a Job #1 of 3/8/07
  • (HAF) Dual zone control A/C w/o (RSP) Uconnect has a Job #1 of 4/2/07 (WK*X74)

Jeep Commander

14-16

  • (WPN) Platinum aluminum wheels have a Job #1 of 3/12/07

Jeep Liberty

8-10

  • Liberty 4x2 models have a 12-14 week lead time

Jeep Wrangler

16-18

  • (GWK) Sunrider soft top with 2-Door has a Job #1 of 3/19/07

Jeep Patriot

8-10

None

No comments: