Tuesday, May 01, 2007

May 01 2007

2007*
DaimlerChrysler Cars

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN WEEKS

KEY PRODUCTION

HOLD OR DELAY

Chrysler 300/300C,

Dodge Magnum,

Dodge Charger

12-14

None

2008 Chrysler Pacifica

TBD

None

Chrysler PT Cruiser

14-16

None

Chrysler Sebring Sedan

16-18

None

2008 Dodge Avenger

TBD

None

Dodge Caliber

20-22

None

Jeep Compass

16-18

  • Compass 4x4 models have a 26-28 week lead time

2007*
DaimlerChrysler Trucks

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN
WEEKS

KEY PRODUCTION

HOLD OR DELAY

2008 Chrysler Town & Country

Dodge Grand
Caravan

TBD

None

Dodge Dakota

14-16

None

Dodge Durango

12-14

None

Chrysler Aspen

8-10

None

Dodge Nitro

12-14

None

Dodge Ram Pickup DR 1500, 2500, 3500 and Mega Cab

12-16

None

Jeep Grand Cherokee

12-14

None

Jeep Commander

12-14

None

Jeep Liberty

8-10

  • Liberty 4x2 models have a 12-14 week lead time

Jeep Wrangler

16-18

None

Jeep Patriot

8-10

None

No comments: