Thursday, February 01, 2007

Chyrsler Pplant Update: 01 February 2007

February 1, 2007

2007*
DaimlerChrysler Cars

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN WEEKS

KEY PRODUCTION

HOLD OR DELAY

Chrysler 300/300C,

Dodge Magnum,

Dodge Charger

8-10

  • 300 and 300C models have a 6-8 week lead time
  • (PW1) Stone White has a fleet Job #1 of 2/5/07

The following options have a Job #1 of 2/12/07:

  • (PJV+29R) Cognac Crystal paint with 29R Pkg.
  • (AJM) SRT Design Group
  • (52Y) Headlamp washer delete tracking w/ (LMP) headlamp washer

The following options have a Job #1 of 2/14/07:

  • (LEU) Auto dim exterior mirror
  • (JHC) Rain sensitive wipers w/ (AFF) Luxury Group and (LMS) Smartbeam headlamps (LX*P48)
  • (29R) Heritage Group
  • (NHP) Adaptive speed control has a Job #1 of 7/27/07
  • (27P) Pkg. is no longer available for ordering

Chrysler Pacifica

8-10

  • AWD models have a 10-12 week lead time
  • (29P) Pkg. has a Job #1 of 2/1/07

The following paint colors have a final build date of 3/23/07**:

  • (PYG) Linen Gold
  • (PPK) Magnesium Pearl
  • (PB6) Marine Blue
  • (PVJ) Cognac Crystal Pearl
  • Pacifica Signature Series (29W) is no longer available for ordering

Chrysler PT Cruiser

6-8

None

Chrysler Sebring Sedan

18-20

  • (RER) AM/FM CD MP3 navigation radio has a Job #1 of 2/5/07
  • (PV6) Sunburst Orange paint has a Job #1 of 1/29/07
  • (XRV) Rear seat video system has a Job #1 of 2/26/07
  • (XWS) Driver sunglass holder has a Job #1 of 3/1/07

2008 Dodge Avenger

TBD

  • (RER) AM/FM CD MP3 navigation radio has a Job #1 of 2/5/07
  • (XRV) Rear seat video system has a Job #1 of 2/26/07
  • (XWS) Driver sunglass holder has a Job #1 of 3/1/07
  • (JSEX41) Avenger R/T AWD model has a Job #1 of 4/23/07

Dodge Caliber

16-18

  • Caliber R/T AWD models have a 20-22 week lead time
  • (CJ1) Front seat side airbags have a Job #1of 3/19/07 (PM**49)

Jeep Compass

14-16

  • Compass FWD models have a 16-18 week lead time
  • (CJ1) Front seat-mounted side airbags have a Job #1 of 3/19/07 (MK**49, MK**74)

2007*
DaimlerChrysler Trucks

RED Indicates changed or new information

The lead time represents the estimated order to delivery period under normal conditions and does not take into consideration holds or delays. Extended lead times (when available) are noted under the Key Production Hold or Delay column.

*All models and constraints are for the 2007 MY unless noted otherwise.

** Orders should be placed at least 30 days prior to the option’s final build date for all DaimlerChrysler vehicles.

Due to various assembly plant assignments for specific model lines or ordered options; the DaimlerChrysler constraints listed below may or may not apply at the time an order is placed.

MODEL

ESTIMATED LEAD
TIME IN
WEEKS

KEY PRODUCTION

HOLD OR DELAY

Chrysler Town & Country

Dodge Grand
Caravan/Caravan

8-10

None

Dodge Dakota

8-10

  • (ASU) R/T Group has a Job #1 of 2/14/07
  • (DMH) 3.92 rear axle ratio w/o (DSA) limited slip differential has a Job #1 of 2/15/07
  • (TXV) P265/70R16 AT tires have a Job #1 of 2/16/07
  • (DHU) Shift-on-the-Fly FT transfer case has a Job #1 of 2/19/07
  • (PJC) Light Khaki paint has a final build date of 3/9/07**
  • (PBT) Patriot Blue paint has a final build date of 3/16/07**
  • (TR2) P255/70R16 AS tires are no longer available for ordering
  • (DHV) Shift-on-the-Fly FT transfer case is no longer available for ordering

Dodge Durango

8-10

None

Chrysler Aspen

8-10

None

Dodge Nitro

8-10

  • Nitro 4x4 models have a 10-12 week lead time
  • (DHZ) Full-time 4WD w/ (EGS) 4.0L V6 engine has a Job #1 of 7/10/07
  • (CW5) Portable utility table has a Job #1 of 7/14/07

Dodge Ram Pickup DR 1500, 2500, 3500 and Mega Cab

8-10

  • Ram 1500 4x2 and 2500 4x4 models have a 6-8 week lead time
  • (LBN + DG3) Power take off has a Job #1 of 2/12/07
  • (ANA) Navigation Convenience Group has a Job #1 of 2/19/07
  • (ETH) 5.9L HO Cummins Turbo Diesel engine w/(NBA) Underground Calibration has a Job #1 of 2/26/07
  • (AR9) Single Rear Wheel Group with (SKS/SKT) heavy duty front springs has a Job #1 of 3/1/07
  • (ETJ) 6.7L Cummins turbo diesel engine w/ (XBC) pickup box delete has a Job #1 of 3/5/07
  • (K40) Body-color body-side molding is no longer available for ordering

Jeep Grand Cherokee

8-10

  • Grand Cherokee 4x2 models have a 10-12 week lead time
  • (TBB) Full-size spare has a Job #1 of 3/8/07
  • (PXR) Black paint has a Job #1 of 3/19/07

Jeep Commander

8-10

  • Commander 4x2 models have a 16-18 week lead time
  • (WPN) Platinum aluminum wheels have a Job #1 of 3/12/07
  • (PXR) Black paint has a Job #1 of 3/19/07

Jeep Liberty

6-8

  • Liberty 4x2 models have an 8-10 week lead time

Jeep Wrangler

12-14

  • (SHG) Electronic front sway bar w/o Rubicon model has a Job #1 of 2/15/07
  • (DSH) Locker rear axle has a Job #1 of 2/15/07
  • (GWK) Sunrider soft top with 2-Door has a Job #1 of 3/19/07

Jeep Patriot

8-10

None

No comments: